From compound to dispatch, in one plant.
Rubber compound, metal parts, tooling and vulcanisation under one roof. Every batch is barcode-traced.
In this section
Nine stops in production
- Compound Preparation Our recipe, our compound
- Metal Production Sheet forming and pressing
- Surface Treatment Blasting and bonding agent
- Mould Assembly Mould preparation and assembly
- Vulcanisation Pressure, temperature and time
- Plastic Injection TPU and thermoplastic injection
- Machine Shop Mould design and CNC machining
- Final Quality Full inspection before shipment
- Machine Park Every step has its own machines
The ten-step flow
Every step from raw material to dispatch in the same plant and the same record.
- A01 Raw Material
- A02 Incoming Quality
- A03 Compound Preparation
- A04 Laboratory
- A05 Metal Production
- A06 Surface Treatment
- A07 Mould Assembly
- A08 Vulcanisation
- A09 Final Quality
- A10 Dispatch
Direct line
Do you have a dimension, or a problem?
Give us the dimension and we will list the match from stock. Describe the problem and engineering will look at it.
- Telephone +90 224 483 60 90
- E-mail info@dorukmak.com.tr
- Working hours Monday – Friday · 08.30 – 18.00 (GMT+3)