Every part is checked before it ships.
Every product that leaves series production passes a full final inspection against its control plan and defect codes.
Final inspection runs two ways: by the operator’s eye and by camera inspection machines.
Final inspection looks at the part through the customer’s eyes: dimensions, appearance and function, checked in that order.
Once inspected, finished products are prepared for dispatch with full traceability, on the customer’s schedule. Process performance and traceability are tracked in the MES.
Technical summary
- Coverage
- 100% of products
- Method
- Operator visual inspection and camera inspection machines
- Reference
- Product control plans and defect codes
- Dispatch
- Fully traced, on schedule
Where it sits in the flow
The ten-step flow
- A01 Raw Material
- A02 Incoming Quality
- A03 Compound Preparation
- A04 Laboratory
- A05 Metal Production
- A06 Surface Treatment
- A07 Mould Assembly
- A08 Vulcanisation
- A09 Final Quality
- A10 Dispatch
Direct line
Do you have a dimension, or a problem?
Give us the dimension and we will list the match from stock. Describe the problem and engineering will look at it.
- Telephone +90 224 483 60 90
- E-mail info@dorukmak.com.tr
- Working hours Monday – Friday · 08.30 – 18.00 (GMT+3)