Every compound is approved before production.
The critical properties of every compound are fully tested in our laboratory before vulcanisation.
Simulation designs the part; international test methods prove it.
Rubber compounds from the compounding department are tested and approved in the laboratory before they go on to preforming for vulcanisation. Every mechanical and physical test we need is run in-house.
At set intervals through the year every test is repeated end to end, as a further check on compound quality and on the reliability of each formulation.
Technical summary
- Coverage
- Every compound, 100%
- Tests
- The full set of mechanical and physical tests
- Periodic validation
- Every test repeated end to end through the year
- Place in the flow
- Step four of ten
Validation tests
The field, in the laboratory.
- Dynamic mud and water spray
- Mud-laden water is sprayed at high pressure on the fitted part while it flexes at extreme angles for one million cycles. A grease analysis at the end confirms zero ingress.
- Ozone and climatic ageing
- The part spends days in ozone chambers and high-temperature ovens; the test confirms the surface stays free of cracks.
- Compression set
- Measures how well the material returns to its original form after compression in grease and at high temperature.
Where it sits in the flow
The ten-step flow
- A01 Raw Material
- A02 Incoming Quality
- A03 Compound Preparation
- A04 Laboratory
- A05 Metal Production
- A06 Surface Treatment
- A07 Mould Assembly
- A08 Vulcanisation
- A09 Final Quality
- A10 Dispatch
Direct line
Do you have a dimension, or a problem?
Give us the dimension and we will list the match from stock. Describe the problem and engineering will look at it.
- Telephone +90 224 483 60 90
- E-mail info@dorukmak.com.tr
- Working hours Monday – Friday · 08.30 – 18.00 (GMT+3)