Tooling ready for the series.
Moulds cut in our own tool room pass measurement, trials and marking on their way to series production.
We hold one of the largest mould stocks in the field, and every mould reaches the series by the same route.
Once designed and made, a mould is first measured, then run in production trials.
A mould that passes dimensional approval is marked to the customer’s requirements, given the surface treatment it needs, and released for series production.
Technical summary
- Mould stock
- One of the largest in the field
- Control
- Measurement and production trials
- Marking
- To the customer’s requirements
- Preparation
- Surface treatment and series release
Where it sits in the flow
The ten-step flow
- A01 Raw Material
- A02 Incoming Quality
- A03 Compound Preparation
- A04 Laboratory
- A05 Metal Production
- A06 Surface Treatment
- A07 Mould Assembly
- A08 Vulcanisation
- A09 Final Quality
- A10 Dispatch
Direct line
Do you have a dimension, or a problem?
Give us the dimension and we will list the match from stock. Describe the problem and engineering will look at it.
- Telephone +90 224 483 60 90
- E-mail info@dorukmak.com.tr
- Working hours Monday – Friday · 08.30 – 18.00 (GMT+3)